Projects Niseko's Mountain Bike Trail Network

Building a Connected Trail Network

Not just a bike park. We build trails across the whole Niseko region: Twin Peaks, Grand Hirafu, Hanazono, and what comes next. Each one is part of a single connected map.
30km+ of trail across four riding areas. 100% community-funded since 2022.

The Niseko Trail Masterplan

What makes Niseko's trails feel like a network is coordination. Instead of each resort or landowner building on their own, NAMBA plans the region as a whole, so every new project plugs into one connected map.
Without that, you get duplicate difficulty levels, disconnected networks, and gaps where the riding mix should be. The masterplan exists to stop that.
  • Connectivity

    Every park and trail area linked, so riders can move between them in a single session.
  • Diversity

    The right spread of difficulty across the region, from green through double-black, so every rider finds something to ride.
  • Distance targets

    Planned growth to bring Niseko's total trail distance in line with the world's biggest MTB destinations.
  • Unified experience

    The same signage and wayfinding at every park.
  • Efficient use of terrain

    The right trail type for the right terrain, with no duplication between parks.
Aerial view of the Niseko region with the planned NAMBA trail network traced in gold across Mount Annupuri, Grand Hirafu, Hanazono, and Twin Peaks

Concept map of Niseko's trail network: existing trails and planned expansion.

This is the reason resorts, landowners, and the local government keep coming back to us. Trail building is one part of what we do. The bigger part is designing the network that makes Niseko's mountains work for summer.

Current Projects

Twin Peaks Bike Park
Operational

Twin Peaks Bike Park

20+ trails, 17km+. Japan's largest free-to-ride MTB park.

See Twin Peaks
Grand Hirafu Bike Park
Operational

Grand Hirafu Bike Park

Bike park expansion: consulting & trail building.

See Grand Hirafu
Niseko Hanazono Bike Park
Opening Summer 2026

Niseko Hanazono Bike Park

4,200m lift-access flow trail + skills park.

See Hanazono
Planning

Yotei 360

50km+ loop circling Mt Yotei.

See Yotei 360

Unified Signage

One consistent signage system across every NAMBA park: trail name, difficulty, direction of travel, sponsor, and a location code for emergencies. Same format whether you're at Twin Peaks, Grand Hirafu, or Hanazono.

Alpine Trails & the Future

Beyond the current parks, we're looking at alpine trails that would connect Niseko's peaks and open up terrain that's currently off-limits to bikes. Add the Mt Yotei loop and continued growth at the resort parks, and you've got a trail system at a scale not seen anywhere else in Asia.
Aerial panorama of Annupuri's peak with ski runs and forested ridge stretching across the Niseko range

Help us build what comes next

Every trail in the NAMBA network has been community-funded. Partner with us to fund what comes next.